Things are starting to get moving with hopefully more movement starting in the next few days.  Crews are onsite moving pipe toward Expansion BLVD. today with hopes of being at Expansion within the next week, weather depending.


Crews work on pipe installation.


A second pipe crew is still expected to begin work on East 4th Street yet this week put as is always possible with construction that timeline may change.  The latest map showing road closures for the East 4th Street work is located on the Quick Links on the project web page.

City staff, the project engineer, and the contractor met last week to discuss traffic flow and emergency vehicle access during the work on Tulip and Rose Lanes.  The contract will require that the two cul-de-sacs at the east side of those two streets will be completely removed and replaced.  The replacement will cause the streets to be closed for 12-15 days for each pour which will cause access issues.  We will be updating the block with additional maps in the upcoming week or so with traffic routing maps for these two areas.  Work on Tulip and Rose Lanes will not occur in the next week or two and we will have maps available for the residents prior to the work beginning.

No comments:

Post a Comment